Failure to use properly condi tioned deck materials can result in deck movement which can damage the roof covering and may void your warranty.
Malarkey roofing installation instructions.
When re covering an existing shingle roof evaluation of the.
Be sure to overlap the eave drip edge too.
Residential building code section r905 2 8 5 drip edge flashing drip edge eave or rake metal is required along the eave and rake edges of shingle roofs.
Underlayment is required on roof decks prior to the installation of malarkey shingles.
Drip edge flashing in accordance with 2015 international building code section 1507 2 9 3 and 2015 international residential building code section r905 2 8 5 install non corrosive 26 gauge sheet.
Kneeling or standing in front of the roll score the release film all the way across with a straight blade knife taking care not to cut the membrane itself.
3 malarkey omniseal system installation instructions application in elevated temperatures.
Install malarkey laminate shingles according to build ing code and local for the rake drip edge start at the corner near the eave and work your way up lapping subsequent lengths of flashing over the lower pieces by a minimum of 2 51 mm.
Nailing pattern use four 4 fasteners for each starter shin gle.
1 malarkey laminate shingle installation instructions.
Malarkey roofing products should only be installed over decks that can sufficiently support the weight of the roofing system and transient load during application of the roofing system.
System such as leaks and buckling increase if installed directly over wood board decks.
Malarkey arctic seal is self adhering but this attribute is affected by cold weather and moisture often making it necessary to fasten the underlayment in place until shingles can be applied.
Be sure to overlap the eave drip edge too.
Unroll cut into manageable lengths and lay out in the sun.
Install drip edge first along the eaves and later on the rakes once the field underlayment has been applied.
Do not place fasteners in the seal down strip.
To apply the rake drip edge start at the corner near the eave and work your way up lapping subsequent lengths of flashing over the lower pieces by a minimum of 2 51 mm.
Malarkey recommends removing the existing roof covering for best performance and appearance.
Begin at a lower corner of roof and roll out 2 3 feet of material 610 914 mm.
Install with fasteners placed 1 3 38 76 mm up from the eave one fastener 1 25 mm from each end of the starter and the remaining two 2 evenly spaced on the same line as the end fasteners.
Allow arctic seal and malarkey right start udl to relax prior to installation.